Routix

01 · ACTPhysical design · 02 Place

Routix. GPU place-and-route and timing closure.

Placement, routing and static timing on GPUs, with ECO agents that run the closure loop and wait for your approval.

Pass 0Initial place and routeWNS −84 ps
Pass 1Agent: buffer 212 nets−31 ps
Pass 2Agent: swap Vt on 96 cells−12 ps
Pass 3Agent: resize 40 drivers−6 ps

Example ECO passes on one block, illustrative.

02 · POLYCapabilities

What it does.

01

GPU placement

Global and detailed placement as large sparse solves on cuSolver and cuDSS.

02

GPU routing

Congestion- and DRC-aware routing across millions of nets.

03

GPU static timing

Full-block timing analysis fast enough to run every pass.

04

ECO agents

Agents propose and apply resize, buffer and Vt-swap changes within your rules.

05

Predictive pruning

Models flag congestion and timing trouble before a full run.

06

Audit trail

Every change, its reason and its approver, logged.

03 · CTExample

Timing, before and after the agent loop.

Worst negative slack
−84 ps−6 ps
Failing paths
1,9124
−100 ps0+120 ps

Example Endpoint slack on one block. Bars left of zero fail timing. Shapes and counts are illustrative.

Routix ECO agent · example

Why did path u_mac/acc_reg[31] fail after the last pass?

The driver was upsized, which raised load on a shared net in the same cluster. I propose buffering the shared net instead and reverting the upsize. Estimated slack after the change: +9 ps on this path, no new violations in the cluster. Waiting for your approval before I apply it.

Illustrative. Agents explain each change, cite the timing runs behind it, and apply nothing outside the rules you set.

04 · M1How it works

One run, start to finish.

  1. 01Minutes

    Ingest

    Netlist, LEF, Liberty, SDC and floorplan.

  2. 02Hours

    Place and route

    GPU placement and routing.

  3. 03Minutes

    Time

    GPU static timing across corners.

  4. 04Hours

    Close

    ECO agents run passes inside your limits.

  5. 05Your flow

    Sign off

    Your sign-off timer checks the result.

05 · V1Specification

The details.

Routix specification (draft)
ItemDetail
InputsVerilog netlist, LEF/DEF, Liberty, SDC, SPEF
OutputsPlaced and routed DEF, timing reports, ECO log
EnginesCUDA, cuSolver, cuDSS sparse solvers; GPU static timing
AgentsNeMo with Guardrails; allowed changes and approvers per block
DeploymentOn-premises or dedicated cloud; air-gapped planned
StatusIn design. Early access with the tape-out cohort.

06 · M2In the flow

Where it sits.

  1. ParetonArchitecture
  2. RoutixPhysical design
  3. VeridexVerification
  4. MaskoraMask
  5. FabtwinFab and yield

Fabtwin manufacturability and yield signalreturns to every stage

Routix takes Pareton candidates, produces layouts for Maskora and designs for Veridex to sign off, and learns from Fabtwin where layouts print badly.

07 · V2Questions

Straight answers.

Does Routix replace our sign-off timer?

No. Your sign-off timing tool stays the gate. Routix makes the loop before it faster.

What do agents change on their own?

Only the change types you allow, up to the number of passes you set. Everything is logged.

Which nodes?

We start where cohort partners are working and will list supported nodes as we qualify them.

08 · PADNext step

Send us one block. See it come back in hours.

Share a block, a layer or a regression you already know well: the runtime, the flow and the result you got. We run the matching Lithory stage on GPUs and show you the runtime and the quality, side by side with your own run.